ADA EARLY CHILDHOOD
CATEGORY: Education
SIZE: 49,000 SF
BUDGET: $4,700,000
COMPLETION: January 2010
LOCATION: Ada, Oklahoma
OWNER: Ada City Schools
CONTRACTOR: The Boldt Company
At nearly 50,000 square feet, the Early Childhood Center is one of the largest projects utilizing insulated concrete forms (ICF) construction. Like giant Lego blocks, the polystyrene forms are stacked together to form a wall with cavity for steel reinforcing and filled with concrete. The roof deck uses polystyrene forms for reinforced concrete. When completed, ICF construction provides good insulation, energy efficiency, reduced noise levels, and a high strength (concrete) building. This school consists of 28 Classrooms, Administration Area, Library, Computer Lab, Vocal Music Room, Cafetorium, and Gymnasium that doubles as a FEMA-Rated Tornado Shelter.